Arborio Corporation was awarded the project which consisted of the construction of a new 16-inch ductile iron transmission main beneath the Palisado Avenue bridge, the construction of new 16-inch ductile iron water main from the bridge to 50 feet to the south and from the bridge to 65 feet to the north, and the construction of 30 feet of the 12-inch water main on the south side of the bridge, along with support equipment and accessories.